Coles

Loading Inventory...
A Description of Westminster Bridge: To Which Are Added, an Account of the Methods Made Use of in Laying the Foundations of its Piers

A Description of Westminster Bridge: To Which Are Added, an Account of the Methods Made Use of in Laying the Foundations of its Piers in Grande Prairie, AB

Current price: $48.33
Get it at ColesVisit retailer's website
A Description of Westminster Bridge: To Which Are Added, an Account of the Methods Made Use of in Laying the Foundations of its Piers

Coles

A Description of Westminster Bridge: To Which Are Added, an Account of the Methods Made Use of in Laying the Foundations of its Piers in Grande Prairie, AB

Current price: $48.33
Loading Inventory...

Size: Paperback

*Product information and pricing may vary - to confirm current pricing, availability, shipping, and return information please contact Coles. In the event of a pricing discrepancy, the retailer's price will apply.
The construction of the first Westminster Bridge, upon which Wordsworth composed his famous sonnet, presented many challenges in terms of the materials and methods with which a sturdy bridge could be built in tidal water and on a gravelly riverbed. A number of candidates presented their surveys to the commissioners of the bridge, but it was the Swiss-born Charles Labelye (1705–62) who was appointed to oversee construction in 1738. The bridge opened to traffic in 1750. This 1751 publication expands upon the shorter work that Labelye had prepared in 1739 to address the laying of the foundations. Significantly, he used caissons - vast wooden structures sunk into the riverbed - within which the stone piers were built. Although the promised illustrations did not appear in this work, the book provides a valuable insight into the technical problems of a major engineering project, and the solutions available at that time.
The construction of the first Westminster Bridge, upon which Wordsworth composed his famous sonnet, presented many challenges in terms of the materials and methods with which a sturdy bridge could be built in tidal water and on a gravelly riverbed. A number of candidates presented their surveys to the commissioners of the bridge, but it was the Swiss-born Charles Labelye (1705–62) who was appointed to oversee construction in 1738. The bridge opened to traffic in 1750. This 1751 publication expands upon the shorter work that Labelye had prepared in 1739 to address the laying of the foundations. Significantly, he used caissons - vast wooden structures sunk into the riverbed - within which the stone piers were built. Although the promised illustrations did not appear in this work, the book provides a valuable insight into the technical problems of a major engineering project, and the solutions available at that time.

Find at Prairie Mall in Grande Prairie, AB

Visit at Prairie Mall in Grande Prairie, AB
Powered by Adeptmind